German car day at the office.
German car day at the office.
Boxed in the final battery pack.
Fitted the passenger seat and seat belts
Rosman, NC for the ~BrewBus event long drive up mountains with the StealthBus.
Fitted new aux charger. Connected charge detection box. Need to clean up wiring.
Fitted the extra charger bolt.
Driver seat fitted, new seat belt.
Passenger seat removed
Fixed interior light – then it stopped, possibly blown?
New aux battery charger (from saveabattery) arrived.
Cable set completed for high speed charging. Connections now possible added to Charger page
Added to Battery log
StealthBus official cruise, towed SB to 4th stop and planned to drive last section. There was an accident right in front of us, which basically aborted the cruise (1 mile in) for Mindy and I while waited for the police to give statements. No one on the VW side hurt. SB did some official laps around the hotel with various people – still was a great weekend!
Coming up on 500 EV miles!
Added to Battery log
Round trip work is running consistently at about a 4.2kWh recharge both ends. So estimated cost of $0.60 vs $3.00 for my Ford explorer… not bad.