2009 08 20

Written by Peter Chave on August 20, 2009 Tags: Uncategorized

Second contactor (~LEV200), 1000A/50mA shunt and some very large crimp connectors arrived from KTA. I can now start on the wiring for the primary circuit on board the Controller panel.

2009 08 17

Written by Peter Chave on August 17, 2009 Tags: Uncategorized

www.stealthbus.net launched…

2009 08 15

Written by Peter Chave on August 15, 2009 Tags: Uncategorized

15 August 2009:

Completed wiring harness for secondary circuit…

2009 08 12

Written by Peter Chave on August 12, 2009 Tags: Uncategorized

12 August 2009:

Autozone for supplies: Automatic battery charger, 100ft GA 14, 80ft GA 18 (black – as the white was not doing it for me), general nuts & bolts kit (Imperial), extra spring washers, flat washers.

Built “parallel” charging harness to give the new batteries a nice float charge.

2009 08 11

Written by Peter Chave on August 11, 2009 Tags: Uncategorized

11 August 2009:

Battery pack arrived, C&D Technology “Max Rate” 138Ah AGM cells, 100 lbs each…

2009 08 03

Written by Peter Chave on August 3, 2009 Tags: Uncategorized

3 August 1009:

Trip to Frys. Bunch of “Bosch” relays, barrier strips, cable GA 18 & GA 16, crimp connectors of various colors.

2009 07 31

Written by Peter Chave on July 31, 2009 Tags: Uncategorized

Ordered vacuum kit from http://www.evsource.com to replace the vacuum signal for the servo assisted Brakes on the Bus

2009 07 25

Written by Peter Chave on July 25, 2009 Tags: Uncategorized

25 August 2009: Disconnect 2/0 crimps – mmmm gonna need a big crimper + fuse (very large!) arrived.

Borrowed Brads trailer, moved the bus to Stockornaut shop in Cumming, GA.

Brakes frozen front and rear.

Had to remove the front calipers, both frozen – required propane + WD 40 + impact wrench (in various combinations for about 30 minutes…)

Rear drums were also tight

Draft work list:

1. New brakes

2. Rebuild transmission

3. Clean/strip parts of bus

4. Mount motor to transmission

5. Build battery racks

6. Mount controller

2009 07 11

Written by Peter Chave on July 11, 2009 Tags: Uncategorized

Converted fuel input from:

to:

Tested reuse of “GEN” lamp on Dashboard to monitor Charger status

2009 07 08

Written by Peter Chave on July 8, 2009 Tags: Uncategorized

Controller, Pot box and contactor arrived.