Completed mock up and placement of primary components, due to cable bending and physical heights of the connections some components needed to be relocated to keep the wiring tidy.
Added fuses to shunt and voltmeter inputs, so all connections from primary to secondary systems are protected. 3 x 1A fuses protect Ammeter and Traction pack voltages.
Need to add diodes to all relay coils.
Acquired basic 15W solar panel – as a experimental aux battery charger.
Requires addition of a basic solar charge controller to be usable long term.