2010 02 27

Written by Peter Chave on February 27, 2010 Tags: Uncategorized

Fitted H4 conversion kits, now both hi and lo beams work.

Tested HID kit on one side, very nice! – will need some modication to fit them. Plan on leaving the installation so can switch back to Halogen if required, incase anything happens with the HID kit.

Side by side test of halogen and HID…

Fitted cup holder from Bus Depot – no more tea on feet!

Refitted fuse panel – cleaned up the wiring a bit, still some more work to get it really neat.

Fitted kick panels – very nice hides most of the wires.

Removed old seats, and test fitted Corbeau A4 seats from our other bus. Plan to revert the 67 bus to the OG seats and will swap the Corbeaus across to the Stealthbus.

Blotted down the aux battery with official clamp kit (replacing the block ‘o wood that was there originally…)

Ordered uP development board which is a PIC uP with 12 ~ADCs, Ethernet with a build in web server. I have idea to convert this to a BMS system. More to come on that idea.

http://microcontrollershop.com/product_info.php?products_id=893&osCsid=cf78aef068dc74ad19a42afa585e5245

Adapted my main charging cord so I can place my “~Kill-A-Watt” meter about 4ft away from the power inlet port.

So now I can have it in front of the charger when I’m adjusting the amps… ~Kill-A-Watt + 1 plug + 1 socket = a lot less than $500 for for built in meter on the charger 🙂