2011 02 26

Written by Peter Chave on February 26, 2011 Categories: Uncategorized

Retrieved keys… at last – required me actually being in the country (and an angle grinder applied liberally to the lower section of the heater pipe).

So next the thing… having not driven SB for 3 weeks and the last trip was in pouring rain, found rear passenger side brake pads had decided to weld themselves to the drum. I started by slacking off the adjusters all the way, could not get the drum off the hub (also decided to weld itself). Tried removing hydraulic lines, e-brake lines, nothing moving… So out comes 4lb club hammer… now it rotates, but the drum is still stuck to the hub… nothing for it… el beast breaker bar – rear nut off, hub+drum removed and given beats with aforementioned club hammer.

Much brake cleaner and shop towels later, all reassembled and ready to go… turn around and there on the floor is the small spring… Bollocks!… 10 minutes later were finally (again) ready to roll.

So while under bus, cleaned up some of the aux wiring and wrapped it all to prevent any damage. Replaced the front brake pins with the larger style, no more clicky pads at low speed (joy!).

Still need to finalize the pre-amp mounting and run the cables for the front speakers… more fun for another day.

Comments Off on 2011 02 26

2011 02 06

Written by Peter Chave on February 6, 2011 Categories: Uncategorized

Saturday morning, Dugi off to party at friends house. “let’s take the stealthbus” I need to move another car out the way,

So put Dugi with keys in the bus.

– 15s later –

Dugi is crying…. “I’m sorry Dad we’re never gonna be able to drive the stealthbus again”….

“why?”….

“I dropped the keys down the window vents!”…..

“doh!”

Next project: disassemble air vents.

Comments Off on 2011 02 06

2010 12 14

Written by Peter Chave on December 14, 2010 Categories: Uncategorized

Can’t believe a whole year has already gone by. On this day 1 year ago the Stealthbus was taking it’s first trips on the streets of Atlanta. 14-Dec-2009 was it’s official inspection for Alternative Fuel status.

Comments Off on 2010 12 14

2010 11 07

Written by Peter Chave on November 7, 2010 Categories: Uncategorized

Gwinnett Environmental and Heritage Center – Open Day.








Comments Off on 2010 11 07

2010 08 28

Written by Peter Chave on August 28, 2010 Categories: Uncategorized

Bug Blast 2010 – StealthBus won 2nd in late bus modified!

First award for the SB.

Comments Off on 2010 08 28

2010 08 24

Written by Peter Chave on August 24, 2010 Categories: Uncategorized

Started covering the rear seats, upgraded the foam to 4 inch high density:

Back lighting complete for the power gauges:

Adjusted throttle linkage:

Comments Off on 2010 08 24

2010 08 14

Written by Peter Chave on August 14, 2010 Categories: Uncategorized

Vents added in back panel, to allow air flow into rear battery pack:

Danger: High Voltage!

Dugi testing the bed mode, the fill in panel, can be stored under the rear seat or on the rear parcel shelf:

Rear panel with vents for the charger:

Mounting rear 9x6s and Amp:

Comments Off on 2010 08 14

2010 07 03

Written by Peter Chave on July 3, 2010 Categories: Uncategorized




Comments Off on 2010 07 03

2010 07 02

Written by Peter Chave on July 2, 2010 Categories: Uncategorized

German car day at the office.

Comments Off on 2010 07 02

2010 07 01

Written by Peter Chave on July 1, 2010 Categories: Uncategorized

Boxed in the final battery pack.

Fitted the passenger seat and seat belts

Comments Off on 2010 07 01