2009 11 16

Written by chivey on November 16, 2009 Tags: Uncategorized

Connected controller panel into bus wiring harness. Controller now enables on the stock key, and latches. One problem I found S10 (fuse) switches OFF when the key is in START position. I suspect that is bad key switch, but since it not that critical to the design I used S11, which works correctly.

2009 11 15

Written by chivey on November 15, 2009 Tags: Uncategorized

Added plate for mounted the throttle box under the throttle pedal using the worlds shortest throttle cable!

Ran 8 x 18-GA wires front to back to provide, throttle control (4 wires), ammeter and pack voltmeter connections.

Vacuum pump will be located on the spare battery tray in the back. Will fabricate a base plate to secure the pump in the correct upright position.

2009 11 13

Written by chivey on November 13, 2009 Tags: Uncategorized

So the project took a 2 week break, I had hoped to have everything done in time for the big VW show in Tampa, but time ran away from us, anyway managed to get a week of and some time in the sun to recharge the human batteries!

Mounted charger, so can be easily accessed for setup / monitoring. Plan on making an armrest to house the charger.

Spoke to Manzaita orientation of the charger is not critical so I will mount on it’s side, using frame metal available.

Upgraded fuel input from 20A to 30A connector, required some metal bending to still be able to mount the plug – it’s about 1cm longer than to 20A version.

Re-used some 50A cable from my old range to connect from the fuel door to a NEMA 30-14 socket inside to the bus, which the charger plugs into.

Re-used an old heater box control arm to make a linkage between the throttle cable and the pot box.

Mounted the throttle box behind battery pack, using new throttle cable. Seemed to work, but we have sticking point in cable at low position, moving the throttle guide tube changes the length of the cable, and so after several hours of adjustment and movement I have decided to abandon that design and locate the pot box under the throttle pedal, so we can control the variables much more finely and avoid some of the problems with the long cable.

2009 10 19

Written by chivey on October 19, 2009 Tags: Uncategorized

Front trays completed, Billie and Mike added threaded rod and bar across the top to hold the batteries down – lookin’ nice! Completed heat shrink and battery boot assembly for battery interconnects. Located fuse and master breaker, completed front battery tray interconnect cable.

Back tray completed, ready to be bolted.

2009 10 18

Written by chivey on October 18, 2009 Tags: Uncategorized

Motor mount wrapped, weld, grind, weld, grind, weld, grind, etc and primed.

Reassembled mount onto motor, shaft key inserted and fixed to coupler.

Lightened flywheel bolted on, clutch reassembled (nice German made – quality stuff…).

Transmission resealed and complete.

Attached mount to motor, transmission to mount, support bar to rear of motor and then the whole package was mounted for final assembly to the bus.

Brought heat gun and heat shrink (from Frys) to finish battery cables, heat gun lasted 3 cables and then stopped working!

Decided to reuse the radio slot for the three main meters: 80-180v (Main Pack), 0-1000A (Main Pack), 6-16v (Aux Battery). Brought a very nice trim piece from Bus Boys in CA, can get these to fit without major modification to radio slot.

2009 10 11

Written by chivey on October 11, 2009 Tags: Uncategorized

Started making first battery and motor cables – needs some heatsink to make these nice and tight.

Hammer crimper is crude but very effective!

2009 10 10

Written by chivey on October 10, 2009 Tags: Uncategorized

Cable arrived from Revolt

10ft of 4/0

50ft of 2/0

It’s all bright orange!

2009 09 29

Written by chivey on September 29, 2009 Tags: Uncategorized

Measured up for battery racks – ordered angle iron.

Clean the transmission within an inch of it’s life – bound to leak now 🙂

Order in for new drive shafts from ~SoCal

2009 09 08

Written by chivey on September 8, 2009 Tags: Uncategorized

Completed mock up and placement of primary components, due to cable bending and physical heights of the connections some components needed to be relocated to keep the wiring tidy.

Added fuses to shunt and voltmeter inputs, so all connections from primary to secondary systems are protected. 3 x 1A fuses protect Ammeter and Traction pack voltages.

Need to add diodes to all relay coils.

Acquired basic 15W solar panel – as a experimental aux battery charger.

Requires addition of a basic solar charge controller to be usable long term.

2009 09 05

Written by chivey on September 5, 2009 Tags: Uncategorized

Vacuum Brakes booster pump kit arrived.